Construction site of the future junction of the 172a with the B 172 on the Sonnenstein near Krietzschwitz. The new route will relieve the city centre of Pirna from through traffic in the future. DEGES is building the route, which is 3.8 kilometres long

px px dpi = cm x cm = MB
Details

Creative#:

TOP29424366

Source:

達志影像

Authorization Type:

RM

Release Information:

須由TPG 完整授權

Model Release:

Not Available

Property Release:

Not Available

Right to Privacy:

No

Same folder images:

Same folder images